Senior Scheduler - Data Center Construction
Turner & TownsendRole Overview
Turner & Townsend is hiring a Senior Scheduler - Data Center Construction. This is a full-time role in Dallas, Texas. posted 6 days ago. The posted range is $160k to $190k. Full responsibilities, required qualifications, and the apply link are listed in the description below.
Resume Keywords to Include
Make sure these keywords appear in your resume to improve ATS scoring
Job description
Turner & Townsend is seeking an experienced Senior Scheduler to join our team to support scheduling as a project controls function on a large-scale project. The ideal individual will have a proven track record of successfully delivering construction project control services.
Responsibilities:
- Develop, manage, and maintain comprehensive integrated master schedules for data center projects from pre-construction through construction hand-off.
- Collaborate with project managers, engineers, procurement, cost managers, and trade partners to gather input, validate sequencing, and ensure schedule feasibility.
- Create and update multiple schedules for a variety of potential scopes for any given project, until lease signing.
- Conduct detailed schedule analysis to identify potential risks, delays, and opportunities for acceleration or optimization.
- Proactively implement recovery strategies and mitigation plans to maintain project milestones and contractual obligations.
- Facilitate and lead schedule review meetings, presenting updates, forecasts, and critical path analyses to internal and external stakeholders.
- Establish, track, and report on key performance indicators (KPIs) to monitor project health, progress trends, and forecasting accuracy.
- Integrate subcontractor and vendor schedules into the master project schedule, ensuring alignment with overall project objectives.
- Support project controls functions including progress measurement, earned value analysis, and delay impact assessments.
- Provide schedule input for change orders, scope modifications, and claims analysis, ensuring accurate documentation and justification.
- Help establish and ensure adherence to client’s scheduling standards, tools, and best practices, contributing to continuous improvement initiatives.
- Assist client with transition from Microsoft Project to P6 EPPM scheduling tools.
- Support a dynamic and flexible client team that is on the cutting edge of data center development.
- SOX control responsibilities may be part of this role, which are to be adhered to where applicable.
- Bachelor’s degree in Construction Management, Engineering, or a related field; equivalent experience may be considered.
- Proficiency in scheduling software, specifically Primavera P6 and knowledge of Microsoft Project,
- Strong understanding of preconstruction and construction sequencing, work breakdown structures, critical path method (CPM,) and best scheduling practices.
- Experience with data center construction or mission-critical infrastructure projects is highly preferred.
- Familiarity with Power BI, Excel, and other reporting tools for KPI tracking and dashboard creation.
- Ability to read and interpret construction drawings and specifications preferred.
- Excellent communication, collaboration, and stakeholder management skills.
The salary range for this full-time role is $160K-$190K per year. Ranges are determined by role and level and represent a good faith effort to provide a fair and equitable salary. This range is a reflection of base salary only, not of a total compensation package. Please note Turner & Townsend reserves the right to pay more or less than the posted range, depending on candidate’s location, experience, and qualifications.
*On-site presence and requirements may change depending on our client's needs*
Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.
We want our people to succeed both in work and life. To support this, we promote a healthy, productive, and flexible working environment that respects work-life balance.
Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community.
Please find out more about us at www.turnerandtownsend.com/ and https://www.heery.com/
All your information will be kept confidential according to EEO guidelines.
#LI-DL1
Join our social media conversations for more information about Turner & Townsend and our exciting future projects:
It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time.
Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review.
About Turner & Townsend
Turner & Townsend
turnerandtownsend.com
137 other open roles at Turner & Townsend on TryApplyNow.
Frequently Asked Questions
How do I apply for the Senior Scheduler - Data Center Construction position at Turner & Townsend?
Use the Apply button above to submit your application directly to Turner & Townsend. Most applications take less than 5 minutes if your resume and contact details are ready, and you'll be routed to the employer's official application system to finish.
Where is the Senior Scheduler - Data Center Construction position at Turner & Townsend located?
This position is based in Dallas, Texas. Turner & Townsend has not indicated remote or hybrid options for this role, so candidates should plan for on-site work.
How much does the Senior Scheduler - Data Center Construction role at Turner & Townsend pay?
Turner & Townsend has posted a compensation range of $160k to $190k for this position. Final offers typically vary based on candidate experience, location, and internal salary bands.
When was the Senior Scheduler - Data Center Construction role at Turner & Townsend posted?
This role was posted on July 8, 2026 (6 days ago). It's still listed as actively hiring; we re-confirm openings against the source system multiple times per day and remove closed roles.
How much experience does the Senior Scheduler - Data Center Construction role at Turner & Townsend require?
This is a senior-level position. Most senior roles call for 5+ years of directly relevant experience. Turner & Townsend lists their specific requirements in the description below, so review the must-have qualifications closely before applying.
More Jobs at Turner & Townsend
View all →Project Manager - Construction Management
Turner & Townsend
Procurement Specialist - Network Infrastructure
Turner & Townsend
Senior Construction Cost Manager - Benchmarking Lead
Turner & Townsend
Risk Manager - Aviation
Turner & Townsend
Senior Cost Manager / Quantity Surveyor – Data Center Construction
Turner & Townsend
AI-powered job search
Get every job scored to your resume
Upload your resume and get jobs ranked, your resume tailored, and employee contacts found automatically.
Get started freeNo credit card to start