Skip to main content
TryApplyNow logo
Turner & Townsend logo

Senior CSA Estimator - Data Center Construction

Turner & Townsend
Be an Early ApplicantFull TimeMid LevelRemote
San Francisco, California, United States (Remote)RemotePosted Today

Role Overview

Turner & Townsend is hiring a Senior CSA Estimator - Data Center Construction. This is a full-time remote role, with the team based in San Francisco, California, United States (Remote). posted today. applications are still in the early window, before most candidates have applied. Full responsibilities, required qualifications, and the apply link are listed in the description below.

Resume Keywords to Include

Make sure these keywords appear in your resume to improve ATS scoring

ShellSOXORProcurementCompensationTurnerTownsendCSA

Job description


Turner & Townsend is seeking an experienced Senior level CSA Estimator to support a high‑profile client’s large‑scale, multi‑building data center campus programs. The role focuses on developing detailed civil, structural, and architectural (CSA) estimates for complex, innovative core‑and‑shell facilities.

This position requires advanced estimating expertise, the ability to operate effectively in fast‑paced and evolving environments, and proven experience supporting multi‑phase delivery across major capital construction programs.

Candidates for this role must be physically based in the United States and legally authorized to work in the U.S. Remote work is permitted only from within the United States; candidates located outside the U.S. cannot be considered for remote employment.


Responsibilities:

  • Develop and manage cost plans and detailed estimates from concept through detailed design across multiple geographies; lead estimate reviews with internal and external teams.
  • Present milestone cost updates (concept, schematic, DD, CD) and clearly communicate basis of estimate, assumptions, inclusions/exclusions, and risks.
  • Lead quantity takeoffs and cost checks for complex, multi‑package CSA scopes; ensure alignment between scope, drawings/models, and estimate.
  • Provide program‑level estimating for defined scopes, synthesizing inputs across multiple projects/campuses to support portfolio‑level decisions.
  • Review contractor pricing (bids, pay applications, change orders); perform comparative assessments and prepare recommendations.
  • Drive benchmarking and cost modeling; build, maintain, and apply historical cost data and metrics; support life‑cycle cost (LCC) analyses.
  • Facilitate value engineering (VE); develop cost/benefit options and support feasibility and early‑stage cost modeling.
  • Support procurement and preconstruction, including prequalification, bid list development, bid analysis, tender reporting, and contract documentation.
  • Partner with cost management, procurement, and project controls to align estimating outputs with budgets, commercial strategy, and program‑level planning.
  • Assess design evolutions and produce timely estimate updates at appropriate accuracy levels.
  • Mentor and coordinate support staff; contribute to training materials, templates, and internal/external estimating tools.
  • Prepare leadership‑ready content for client preconstruction and estimating presentations.
  • SOX control responsibilities may be part of this role and must be adhered to where applicable.

 

  • Bachelor’s degree in construction management, cost management, quantity surveying, engineering or field related to construction. 
  • Minimum 5-7 years of relevant experience 
  • Experience in a construction cost management role such as Cost Manager, Quantity Surveyor, Estimator, Cost Engineer, Project Engineer, Project Cost Controls etc. 
  • Experience providing conceptual estimating services and/or pre-construction services at a construction management or related firm. 
  • Experience supporting large scale construction projects and programs 
  • Good knowledge of construction industry technical matters, such as value management and value engineering. 
  • Excellent communication skills. 


*On-site presence and requirements may change depending on our client's needs.*

The base salary range for this full-time role is $130K-$170K per year. Ranges are determined by role and level and represent a good faith effort to provide a fair and equitable salary. This range is a reflection of base salary only, not of a total compensation package.  Please note Turner & Townsend reserves the right to pay more or less than the posted range, depending on candidate’s experience and qualifications. 

Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.

We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance. 

Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community.

Please find out more about us at www.turnerandtownsend.com/

Turner & Townsend does not accept any speculative or unsolicited CV’s that have been sent to our internal recruitment team or hiring managers from agencies outside of our preferred supplier list or that have not followed due process. Any speculative or unsolicited CV’s will be treated as a direct application.


All your information will be kept confidential according to EEO guidelines.
 

#LI-MB1

Join our social media conversations for more information about Turner & Townsend and our exciting future projects: 

Twitter

Instagram

LinkedIn

It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time. 

Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review. 

About Turner & Townsend

Turner & Townsend logo

Turner & Townsend

turnerandtownsend.com

Hires remote

139 other open roles at Turner & Townsend on TryApplyNow.

Frequently Asked Questions

How do I apply for the Senior CSA Estimator - Data Center Construction position at Turner & Townsend?

Use the Apply button above to submit your application directly to Turner & Townsend. Most applications take less than 5 minutes if your resume and contact details are ready, and you'll be routed to the employer's official application system to finish.

Is the Senior CSA Estimator - Data Center Construction role at Turner & Townsend remote?

Yes. This is a remote role. The team is based in San Francisco, California, United States (Remote), but the position itself does not require relocating to that office.

What does a Senior CSA Estimator - Data Center Construction at Turner & Townsend earn?

Turner & Townsend has not disclosed a salary range in this posting. Many employers share specifics later in the interview process; you can also ask during a recruiter screen if compensation transparency is important to you.

When was the Senior CSA Estimator - Data Center Construction role at Turner & Townsend posted?

This role was posted on July 23, 2026 (today). It's still listed as actively hiring; we re-confirm openings against the source system multiple times per day and remove closed roles.

AI-powered job search

Get every job scored to your resume

Upload your resume and get jobs ranked, your resume tailored, and employee contacts found automatically.

Get started free

No credit card to start