Skip to main content
TryApplyNow logo
Turner & Townsend logo

Senior Construction Scheduler - Aviation

Turner & Townsend
USA wide, United States (Remote)RemotePosted Yesterday

Role Overview

Turner & Townsend is hiring a Senior Construction Scheduler - Aviation. This is a full-time remote role, with the team based in USA wide, United States (Remote). Part of Turner & Townsend's Security hiring, posted yesterday. Full responsibilities, required qualifications, and the apply link are listed in the description below.

Resume Keywords to Include

Make sure these keywords appear in your resume to improve ATS scoring

SOXORCompensationTurnerTownsendSchedulerInfrastructureDue

Job description

Turner & Townsend is seeking an experienced Senior Scheduler to join our talented Infrastructure team to support scheduling as a project controls function on a large-scale project. The ideal individual will have a proven track record of successfully delivering construction project control services.   

** Due to federal contract requirements, applicants must be U.S. citizens and capable of obtaining and maintaining a U.S. Public Trust security clearance. Employment is contingent upon successful completion of the Public Trust investigation. **

Responsibilities:  

  • Develop, monitor and update owners' Project Integrated Master Schedule (IMS).  
  • Establish the schedule management program and deliverables to be used on large scale capital programs.  
  • Interface with project stakeholders as trusted advisors to provide guidance and recommendations for the project.  
  • Prepare baseline schedules and schedule basis documents for approval by project teams.  
  • Conduct schedule of resource loading and leveling.  
  • Consolidate contractors schedule to incorporate into IMS.  
  • Assess impacts on the critical path and near-critical activities and report to the project team.  
  • Monitor schedule deviations and variances and assist in the development of alternative methods for corrective action.  
  • Apply EVM methodology to measure project progress.  
  • Review schedules with project team members on a regular basis to ensure that accurate and timely data is incorporated into the schedule.  
  • Prepare and provide schedule progress reports, trending charts, and schedule analysis on a periodic basis.  
  • Maintain record of scope changes, trends and variances that potentially affect schedule performance.  
  • Assure the credibility of the information contained in the schedule.  
  • Maintain liaison with clients and other consultants at all projects stages.  
  • SOX control responsibilities may be part of this role, which are to be adhered to where applicable. 
  • Bachelor’s degree in construction management, cost management, quantity surveying, engineering or field related to construction. 
  • Minimum 5-7 years of applicable experience. 
  • Direct experience working on teams within a complex matrix environment.  
  • Expertise using Primavera P6.  
  • Excellent communication skills.  

The salary range for this full-time role is $140K-$200K per year. Ranges are determined by role and level and represent a good faith effort to provide a fair and equitable salary. This range is a reflection of base salary only, not of a total compensation package.  Please note Turner & Townsend reserves the right to pay more or less than the posted range, depending on candidate’s experience and qualifications

*On-site presence and requirements may change depending on our client's needs* 

Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change. 

We want our people to succeed both in work and life. To support this, we promote a healthy, productive, and flexible working environment that respects work-life balance.  

Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community. 

Please find out more about us at www.turnerandtownsend.com/ and https://www.heery.com/ 

All your information will be kept confidential according to EEO guidelines.

#LI-AM1

Join our social media conversations for more information about Turner & Townsend and our exciting future projects: 

Twitter

Instagram

LinkedIn

It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time. 

Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review. 

About Turner & Townsend

Turner & Townsend logo

Turner & Townsend

turnerandtownsend.com

SecurityHires remote

115 other open roles at Turner & Townsend on TryApplyNow.

Frequently Asked Questions

How do I apply for the Senior Construction Scheduler - Aviation position at Turner & Townsend?

Use the Apply button above to submit your application directly to Turner & Townsend. Most applications take less than 5 minutes if your resume and contact details are ready, and you'll be routed to the employer's official application system to finish.

Is the Senior Construction Scheduler - Aviation role at Turner & Townsend remote?

Yes. This is a remote role. The team is based in USA wide, United States (Remote), but the position itself does not require relocating to that office.

What does a Senior Construction Scheduler - Aviation at Turner & Townsend earn?

Turner & Townsend has not disclosed a salary range in this posting. Many employers share specifics later in the interview process; you can also ask during a recruiter screen if compensation transparency is important to you.

When was the Senior Construction Scheduler - Aviation role at Turner & Townsend posted?

This role was posted on July 20, 2026 (yesterday). It's still listed as actively hiring; we re-confirm openings against the source system multiple times per day and remove closed roles.

AI-powered job search

Get every job scored to your resume

Upload your resume and get jobs ranked, your resume tailored, and employee contacts found automatically.

Get started free

No credit card to start