QA/QC Project Manager- Data Center Construction
Turner & TownsendRole Overview
Turner & Townsend is hiring a mid-level QA/QC Project Manager- Data Center Construction. This is a full-time role in Philadelphia, Pennsylvania. Part of Turner & Townsend's Qa hiring, posted last week. Full responsibilities, required qualifications, and the apply link are listed in the description below.
Resume Keywords to Include
Make sure these keywords appear in your resume to improve ATS scoring
Job description
Turner & Townsend are seeking an experienced Quality Assurance PM (Mechanical or Electrical) to join our team in support of the Data Center Construction team. The ideal individual will have prior experience supporting large-scale construction projects.
Responsibilities:
- Effectively manage and collaborate with project stakeholders.
- Effective communication across our internal team to ensure efficiency and a consistent delivery to the client.
- Can analyze, track, and effectively manage critical milestone activities to avoid schedule slip.
- Verify that effective project governance, processes and systems are utilized.
- Ensure application of best practice on all projects.
- Production of formal project status reports and other reports as required.
- Monitor the progress of multiple construction projects simultaneously to ensure that the approved design standards are being applied correctly.
- Manage the interface between all suppliers through monthly trackers and weekly reviews.
- Manage the flow of project information between the project team through regular meetings and written communications.
- Forecast and update key project milestones.
- Manage and monitor local design teams in accordance with commission criteria.
- Provide technical support to owners, architects, general contractors and regional stakeholders.
- Rapid response to RFIs from the field.
- Provide expertise for cost control, value engineering, and constructability guidance where required.
- Independent review of status reports, drawing submittals, timelines and costs from architects, contractors and suppliers.
- Client management – assist in developing excellent working relationships with Clients, with a view towards maximizing new opportunities.
- Strategic Thinking - provides advice to project teams on approaches that can be adopted to successfully achieve both clients’ objectives and business objectives.
- Knowledge management – ensure that key information and learnings generated from each project is captured.
- Process improvement – Identify ways to improve internal systems and processes
- SOX control responsibilities may be part of this role, which are to be adhered to where applicable.
- Bachelor’s degree in construction management, mechanical engineering, or applicable bachelor’s degree and or equivalent experience.
- Minimum 5-7 years of relevant project management experience, specifically working with mechanical systems in the built environment.
- Strong organizational and management skills – ability to work effectively and collaboratively with the broader team.
- Background working in design or construction with a mechanical or BMS controls experience.
- AND/OR Background working in a vendor equipment factory supporting quality control processes of mechanical equipment.
- AND/OR Background working in commissioning of mechanical systems and equipment in mission critical data centers.
- Proficiency managing construction documents including BODs, specifications, contract drawings, C/D/E’s, equipment submittals and RFIs.
- Proficiency in Excel, Word, PowerPoint, Outlook, Procore, Project, Smartsheets, and other construction project management tools
*On-site presence and requirements may change depending on our client's needs.*
Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.
We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance.
Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community.
Please find out more about us at www.turnerandtownsend.com/
Turner & Townsend does not accept any speculative or unsolicited CV’s that have been sent to our internal recruitment team or hiring managers from agencies outside of our preferred supplier list or that have not followed due process. Any speculative or unsolicited CV’s will be treated as a direct application.
All your information will be kept confidential according to EEO guidelines.
#LI-MK3
Join our social media conversations for more information about Turner & Townsend and our exciting future projects:
It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time.
Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review.
About Turner & Townsend
Turner & Townsend
turnerandtownsend.com
114 other open roles at Turner & Townsend on TryApplyNow.
Frequently Asked Questions
How do I apply for the QA/QC Project Manager- Data Center Construction position at Turner & Townsend?
Use the Apply button above to submit your application directly to Turner & Townsend. Most applications take less than 5 minutes if your resume and contact details are ready, and you'll be routed to the employer's official application system to finish.
Where is the QA/QC Project Manager- Data Center Construction position at Turner & Townsend located?
This position is based in Philadelphia, Pennsylvania. Turner & Townsend has not indicated remote or hybrid options for this role, so candidates should plan for on-site work.
What does a QA/QC Project Manager- Data Center Construction at Turner & Townsend earn?
Turner & Townsend has not disclosed a salary range in this posting. Many employers share specifics later in the interview process; you can also ask during a recruiter screen if compensation transparency is important to you.
When was the QA/QC Project Manager- Data Center Construction role at Turner & Townsend posted?
This role was posted on July 14, 2026 (7 days ago). It's still listed as actively hiring; we re-confirm openings against the source system multiple times per day and remove closed roles.
Similar Jobs
More Jobs at Turner & Townsend
View all →Assistant Project Manager- Construction
Turner & Townsend
Site Lead Project Manager - Data Center Construction
Turner & Townsend
Global EA Finance Business Partner
Turner & Townsend
Cost Engineer
Turner & Townsend
Construction Project Manager (Anticipated Opening)
Turner & Townsend
AI-powered job search
Get every job scored to your resume
Upload your resume and get jobs ranked, your resume tailored, and employee contacts found automatically.
Get started freeNo credit card to start