Civil Project Manager ( Data Center Construction core & shell )
SEGNOL By DINJANAhmedabad, Gujarat, INPosted Today
Job Description
Role & responsibilities
- Lead end-to-end delivery of civil, structural, and architectural (Core & Shell) works for hyperscale data center projects
- Review and validate Design Basis Reports (DBR), structural calculations, architectural concepts, and consultant submissions
- Ensure all civil and structural designs meet data center operational and hyperscale infrastructure requirements
- Approve Good for Construction (GFC) drawings ensuring constructability and cross-functional coordination
- Manage execution of:
- Earthworks & excavation
- Foundations & piling systems
- RCC and structural steel works
- Building envelope systems
- Architectural finishes
- Ensure construction is executed as per approved drawings, specifications, and safety standards
- Develop and manage detailed project schedules using Primavera / MSP, ensuring milestone adherence
- Coordinate with MEP design teams, EPC partners, consultants, and PMO for seamless execution
- Ensure timely handover of civil fronts for MEP installation readiness
- Prepare and manage Core & Shell budgets, monitor cost vs actuals, and drive value engineering initiatives
- Conduct value engineering workshops to optimize cost, timelines, and material utilization
- Implement and enforce QA/QC processes, conduct audits, and ensure compliance with:
- NBC / IS Codes
- Local building regulations
- Fire & safety standards
- Review and interpret geotechnical reports and recommend optimal foundation strategies
- Proactively identify and resolve civilMEP clashes during design and execution phases
- Track and evaluate contractor performance, productivity, and quality metrics
- Drive reduction in NCRs (Non-Conformance Reports) and defects
Preferred candidate profile
- Bachelors Degree in Civil Engineering (mandatory)
- 1015 years of relevant experience in:
- Large-scale civil construction
- Mission-critical / industrial / infrastructure projects
- Data center projects (strongly preferred)
- Proven experience in Core & Shell construction and structural execution
- Strong expertise in:
- Structural engineering
- Foundation systems & soil mechanics
- Geotechnical analysis
- Hands-on experience in project planning & scheduling (Primavera / MSP)
- Strong experience in budgeting, cost control, and value engineering
- Experience managing EPC contractors, consultants, and multi-stakeholder environments
- Working knowledge of AutoCAD / BIM / Revit
- Strong understanding of QA/QC processes, compliance standards, and safety regulations
- High attention to detail with strong execution discipline
- Ability to manage fast-track, high-pressure infrastructure projects
Strongly Preferred:
- Data Center Construction
- Industrial / Manufacturing Projects
- EPC / Large Infrastructure Projects
- Mission-Critical Facilities
Good to Have Certifications
- PMP / Construction Management Certification
- CDCP / CDCS (EPI) highly preferred for data center projects
About SEGNOL By DINJAN
SEGNOL By DINJAN
QaOn-site
Want AI-powered job matching?
Upload your resume and get every job scored, your resume tailored, and hiring manager emails found - automatically.
Get Started Free